Result in% current by performance level across all contracts
David Wurth
The result in% (according to performance level) can only be displayed for individual contracts so far.
If you want to see the current result in% of all available figures in a project with several contracts, this will not be displayed.
In the screenshot, the position in the internal area of the Excel list with the calculation.
If the order amount is 0.00€ and there are still costs associated with the contract, projo currently shows 0%. (Division by zero is not possible) Here it would be good to add an explanation with Infobubble and replace 0% with an infinite symbol ∞. The costs are still included in the calculation.