projo logo
projo
Create
Roadmap
Feedback
Bugs
100

    Boards

  • Feature Requests

  • Bugs

Powered by Canny

Bugs

posts
Additional costs are not shown in Project Controlling
(662) office building The additional costs created under external costs are not displayed in Project Controlling:
1
·

planned long

Calculation of vacation for half holidays
(1021) Buss+Weaver When depositing half a public holiday (24th and 31.12.), there have been problems so far when telling the hour, but that is not the cause here. Something else has appeared here... when the holidays were deposited later, i.e. first a vacation application, then the public holidays were set up, no vacation was calculated, which would have to be twice half a day. Aylin von Buss + Weber shows that she is not working on the two days, but she has a 5-day week and no other absences that would possibly overlap. No vacation is deducted.
1
·

planned long

Powered by Canny